Repository logo
 

An appropriate Bus Rapid Transit System

Thumbnail Image

Date

2014-04

Journal Title

Journal ISSN

Volume Title

Publisher

IJST Publications

Abstract

Bus Rapid Transit (BRT) has been adopted as an improvement on regular bus services through the combination of features like infrastructure changes that resulted in better operation speeds and service reliability. In this regards, it does pose a problem in selecting a BRT that is most suitable for a particular area/region. Hence, this study suggests an appropriate BRT system during in-depth literature review. To be able to select the appropriate vehicle option for a BRT system for a particular area/corridor, the transport demand, coverage/distance to be covered and length of public transport delay due to general traffic condition must be put into proper consideration. In terms of cost implication, median BRT system and kerbside BRT system should be selected over segregated BRT system.

Description

Keywords

Bus Rapid Transit System, Corridor, Transport Demand, Speed

Citation

Adewumi, E. and Allopi, Prof. D. 2014. An appropriate Bus Rapid Transit System. The International Journal of Science & Technology. 3(4) : 248-254.

DOI

Endorsement

Review

Supplemented By

Referenced By